Skip to content

chore(ci): add concurrency control to all workflows#258

Open
avrabe wants to merge 1 commit intomainfrom
chore/ci-concurrency-control
Open

chore(ci): add concurrency control to all workflows#258
avrabe wants to merge 1 commit intomainfrom
chore/ci-concurrency-control

Conversation

@avrabe
Copy link
Copy Markdown
Contributor

@avrabe avrabe commented May 2, 2026

Summary

Adds top-level concurrency: blocks to all workflows per the org-wide CI Concurrency Hardening brief. Superseded PR runs are cancelled; main / tag / scheduled / release runs are protected.

Why

Org-wide stats (2026-05-02): 93 workflows queued across the org; oldest queued job 23h old. Rivet has been intermittently sitting at 5h+ stalls on chore PRs (#246, #256). Without concurrency control, every PR push starts a fresh run while older runs on superseded commits keep executing for zero useful signal.

Variants applied

File Variant Reason
benchmarks.yml default regular CI
ci.yml default regular CI
compliance.yml compliance name + produces compliance reports; never cancel
release.yml release tag-triggered binary publish; never cancel
release-npm.yml release npm publish; never cancel; keyed on tag-name with fallback

Already had correct concurrency, left alone

  • rivet-delta.yml: groups by pull_request.number, always cancels — correct for a PR-only workflow.
  • fuzz.yml: groups by ref, cancel-in-progress: false — correct for hybrid push+schedule (one fuzz run per ref, scheduled corpus growth never lost).

Verification

  • All YAMLs parse via Python yaml.safe_load.
  • Diff is workflow-files-only (5 files, 32 insertions, 0 deletions).
  • Verify on this PR: push a no-op follow-up commit. The earlier PR run should show Cancelled in Actions UI within ~30s; the new run starts.
  • Verify post-merge: the post-merge main run completes normally (not cancelled).

Out of scope (separate work)

Per the brief: not changing runs-on:, not splitting matrices, not changing caching, not minimizing permissions:. Those depend on this landing first.

🤖 Generated with Claude Code

Add top-level `concurrency:` blocks to every workflow so superseded PR
runs are cancelled while runs on `main`, tags, releases, and scheduled
events complete normally. Org-wide context: 93 workflows queued across
the org as of 2026-05-02 with the oldest job 23h old; rivet has been
intermittently sitting at 5h+ runner-queue stalls on chore PRs.

Without this, every PR push starts a fresh run while previous runs on
superseded commits keep executing — agents pushing 2-5 commits per
minute multiply queue pressure for zero useful signal. The conditional
`cancel-in-progress: ${{ github.event_name == 'pull_request' }}`
preserves all main-branch and scheduled work.

Variants applied per the brief:

- **default** (cancel only on PR): `benchmarks.yml`, `ci.yml`
- **compliance** (serialize, never cancel — partial reports leave
  registries / attestations inconsistent): `compliance.yml`
- **release** (serialize per-tag, never cancel — partial publish
  leaves npm / GitHub Release inconsistent): `release.yml`,
  `release-npm.yml`. `release-npm.yml` keys on tag-name with
  fallback through `inputs.version` and `github.ref` for
  workflow_dispatch.

Already had correct concurrency, left alone:

- `rivet-delta.yml`: groups by `pull_request.number`, always cancels
  (correct: PR-only workflow, no main runs to protect).
- `fuzz.yml`: groups by ref with `cancel-in-progress: false` (correct
  for hybrid push+schedule workflow; one fuzz run per ref serializes
  cleanly without losing scheduled corpus growth).

Verification before merge:
- All YAMLs parse cleanly via Python yaml.safe_load.
- Diff is workflow-files-only — no job restructure, no runs-on
  change, no caching change.

Trace: skip
Copy link
Copy Markdown

@github-actions github-actions Bot left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

⚠️ Performance Alert ⚠️

Possible performance regression was detected for benchmark 'Rivet Criterion Benchmarks'.
Benchmark result of this commit is worse than the previous benchmark result exceeding threshold 1.20.

Benchmark suite Current: 9efe096 Previous: 2ff1c15 Ratio
link_graph_build/10000 43514334 ns/iter (± 4405694) 35202528 ns/iter (± 4357740) 1.24
validate/10000 26399790 ns/iter (± 1319748) 21929182 ns/iter (± 2893932) 1.20
query/10000 140490 ns/iter (± 1938) 113495 ns/iter (± 2740) 1.24

This comment was automatically generated by workflow using github-action-benchmark.

@codecov
Copy link
Copy Markdown

codecov Bot commented May 3, 2026

Codecov Report

✅ All modified and coverable lines are covered by tests.

📢 Thoughts on this report? Let us know!

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant