Skip to content

Commit f1fc599

Browse files
author
DavidQ
committed
Promote Level 18 overlay system to baseline after final validation.
1 parent ad589ef commit f1fc599

5 files changed

Lines changed: 24 additions & 45 deletions

File tree

docs/dev/CODEX_COMMANDS.md

Lines changed: 4 additions & 6 deletions
Original file line numberDiff line numberDiff line change
@@ -2,11 +2,9 @@ MODEL: GPT-5.4-codex
22
REASONING: low
33

44
COMMAND:
5-
Run full overlay system validation:
6-
- Validate all Level 17 + 18 functionality
7-
- Confirm integrations (input, mission, telemetry)
8-
- Identify any blocking defects
9-
10-
Do not modify behavior unless required to fix a blocker.
5+
Promote Level 18 overlay system to baseline.
6+
- Update status markers only
7+
- Confirm no regressions
8+
- Do not change runtime behavior
119

1210
Package ZIP to <project folder>/tmp/

docs/dev/COMMIT_COMMENT.txt

Lines changed: 1 addition & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -1,2 +1 @@
1-
Level 18.9 final overlay system validation and readiness check.
2-
Confirm system stability and production readiness.
1+
Promote Level 18 overlay system to baseline after final validation.
Lines changed: 3 additions & 7 deletions
Original file line numberDiff line numberDiff line change
@@ -1,8 +1,4 @@
1-
[ ] All samples load correctly
2-
[ ] Bottom-right placement consistent
3-
[ ] Non-Tab cycle works everywhere
4-
[ ] Mission integration verified
5-
[ ] Telemetry integration verified
6-
[ ] No performance issues
1+
[ ] Smoke test complete
2+
[ ] All integrations stable
73
[ ] No regressions
8-
[ ] System ready for production
4+
[ ] Baseline confirmed

docs/dev/roadmaps/MASTER_ROADMAP_HIGH_LEVEL.md

Lines changed: 1 addition & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -632,6 +632,7 @@
632632
- [x] Collision overlays
633633
- [x] Scene graph inspector
634634
- [x] Level 17 debug overlay baseline promoted after validation (1708-1713: bottom-right placement, KeyG cycle key, correct stack ordering)
635+
- [x] Level 18 overlay system baseline promoted after validation (input, mission, telemetry integration; no Level 17/18 overlay regressions)
635636

636637
### Sample Phase Tracks
637638
- [x] 3D phase normalized

docs/pr/BUILD_PR.md

Lines changed: 15 additions & 30 deletions
Original file line numberDiff line numberDiff line change
@@ -1,36 +1,21 @@
1-
# BUILD_PR_LEVEL_18_9_OVERLAY_FINAL_VALIDATION_AND_READINESS
1+
# BUILD_PR_LEVEL_18_10_OVERLAY_PROMOTE_BASELINE
22

3-
## PLAN
3+
## Purpose
4+
Promote Level 18 overlay system to baseline after successful validation.
45

5-
### Purpose
6-
Perform final validation of the overlay system after Level 18 integrations and confirm readiness for production use.
7-
8-
### Goals
9-
- Validate all integrations (input, mission, telemetry)
10-
- Confirm stability and performance
11-
- Ensure no regressions across samples
12-
13-
---
14-
15-
## BUILD
16-
17-
### Scope
18-
- Full system validation across all samples
19-
- Verify:
20-
- Bottom-right placement
21-
- Non-Tab cycle behavior
6+
## Scope
7+
- Mark Level 18 as complete
8+
- Confirm baseline:
229
- Config-driven stacks
10+
- Non-Tab cycle key
11+
- Bottom-right placement
2312
- Mission + telemetry integration
24-
- No feature or runtime changes unless blocking issue found
13+
- Diagnostics and persistence
2514

26-
### Test Steps
27-
1. Load all Level 17/18 samples
28-
2. Cycle overlays under load
29-
3. Trigger mission + telemetry updates
30-
4. Resize + rapid switching tests
31-
5. Confirm persistence and diagnostics behavior
15+
## Test Steps
16+
1. Smoke test all samples
17+
2. Verify integrations remain stable
18+
3. Confirm no regressions
3219

33-
### Expected
34-
- Fully stable overlay system
35-
- All integrations working
36-
- Ready for production baseline
20+
## Expected
21+
- Stable production-ready baseline

0 commit comments

Comments
 (0)