Skip to content

Commit ad589ef

Browse files
author
DavidQ
committed
Level 18.9 final overlay system validation and readiness check.
Confirm system stability and production readiness.
1 parent 10c171b commit ad589ef

6 files changed

Lines changed: 89 additions & 29 deletions

File tree

docs/dev/CODEX_COMMANDS.md

Lines changed: 7 additions & 5 deletions
Original file line numberDiff line numberDiff line change
@@ -1,10 +1,12 @@
11
MODEL: GPT-5.4-codex
2-
REASONING: medium
2+
REASONING: low
33

44
COMMAND:
5-
Integrate overlay system with telemetry system:
6-
- Connect Telemetry Overlay to telemetry data
7-
- Ensure real-time updates
8-
- Preserve overlay behavior and performance
5+
Run full overlay system validation:
6+
- Validate all Level 17 + 18 functionality
7+
- Confirm integrations (input, mission, telemetry)
8+
- Identify any blocking defects
9+
10+
Do not modify behavior unless required to fix a blocker.
911

1012
Package ZIP to <project folder>/tmp/

docs/dev/COMMIT_COMMENT.txt

Lines changed: 2 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -1,2 +1,2 @@
1-
Level 18.8 overlay integration with telemetry system.
2-
Enable Telemetry Overlay to reflect live system metrics.
1+
Level 18.9 final overlay system validation and readiness check.
2+
Confirm system stability and production readiness.
Lines changed: 47 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,47 @@
1+
# BUILD_PR_LEVEL_17_61_OVERLAY_SYSTEM_VALIDATION_SWEEP
2+
3+
Date: 2026-04-16
4+
Scope: Validation-only sweep for Level 17 + Level 18 overlay-related functionality and integrations.
5+
Behavior changes: None.
6+
7+
## Objectives
8+
- Validate Level 17 overlay functionality.
9+
- Validate Level 18 runtime functionality that may interact with shared systems.
10+
- Confirm integrations for input, mission feed, and telemetry overlay updates.
11+
- Identify blocking defects.
12+
13+
## Validation Command
14+
Custom Node test harness with alias hooks (`/src`, `/samples`, `/tools`, `/games`) executing targeted run-export test modules.
15+
16+
## Executed Tests
17+
- `tests/runtime/Phase17RealGameplaySample.test.mjs`
18+
- `tests/runtime/Phase17OverlayDiagnosticsTooling.test.mjs`
19+
- `tests/runtime/Phase17DebugOverlayBottomRightPosition.test.mjs`
20+
- `tests/runtime/Phase17Sample1709MovementModelsLab.test.mjs`
21+
- `tests/runtime/Phase17RenderingTechniqueExpansionSanity.test.mjs`
22+
- `tests/runtime/Phase17Sample1712GameplayMetricsTelemetry.test.mjs`
23+
- `tests/runtime/Phase17Sample1713FinalReferenceGame.test.mjs`
24+
- `tests/runtime/Phase17TabDebugOverlayCycle1707Plus.test.mjs`
25+
- `tests/runtime/Phase18RuntimeLayerScaffold.test.mjs`
26+
- `tests/runtime/Phase18IntegrationFlowPass.test.mjs`
27+
- `tests/runtime/Phase18CoreServicesSkeleton.test.mjs`
28+
- `tests/tools/CollisionOverlaysDebugPanel.test.mjs`
29+
- `tests/tools/DevConsoleDebugOverlay.test.mjs`
30+
- `tests/games/FullscreenBezelOverlay.test.mjs`
31+
32+
## Results
33+
- Passed: 14
34+
- Failed: 0
35+
- Blocking defects: None
36+
37+
## Integration Confirmation
38+
- Input integration: Pass
39+
- Overlay cycling, reverse cycling, latch behavior, and persisted index restoration validated.
40+
- Mission integration: Pass
41+
- Mission feed overlay transitions and live mission-state visibility validated in gameplay samples.
42+
- Telemetry integration: Pass
43+
- Telemetry overlay reflects real-time gameplay metrics and overlay telemetry state.
44+
45+
## Notes
46+
- No runtime or test behavior changes were required.
47+
- This is a status-only validation artifact.
Lines changed: 5 additions & 4 deletions
Original file line numberDiff line numberDiff line change
@@ -1,6 +1,7 @@
1-
Full validation sweep for Level 17 debug overlay system after key remap and stack alignment PRs.
1+
Final validation pass for overlay system after full Level 18 integration.
22

33
Confirms:
4-
- All samples aligned
5-
- No Tab dependency remains
6-
- Overlay system consistent
4+
- Stability
5+
- Performance
6+
- Integration completeness
7+
- Production readiness
Lines changed: 8 additions & 4 deletions
Original file line numberDiff line numberDiff line change
@@ -1,4 +1,8 @@
1-
[ ] Telemetry Overlay updates with data
2-
[ ] Overlay cycle unaffected
3-
[ ] No regression in other overlays
4-
[ ] Stable performance
1+
[ ] All samples load correctly
2+
[ ] Bottom-right placement consistent
3+
[ ] Non-Tab cycle works everywhere
4+
[ ] Mission integration verified
5+
[ ] Telemetry integration verified
6+
[ ] No performance issues
7+
[ ] No regressions
8+
[ ] System ready for production

docs/pr/BUILD_PR.md

Lines changed: 20 additions & 14 deletions
Original file line numberDiff line numberDiff line change
@@ -1,30 +1,36 @@
1-
# BUILD_PR_LEVEL_18_8_OVERLAY_TELEMETRY_SYSTEM_INTEGRATION
1+
# BUILD_PR_LEVEL_18_9_OVERLAY_FINAL_VALIDATION_AND_READINESS
22

33
## PLAN
44

55
### Purpose
6-
Integrate overlay system with telemetry system so Telemetry Overlay reflects live system metrics and state.
6+
Perform final validation of the overlay system after Level 18 integrations and confirm readiness for production use.
77

88
### Goals
9-
- Sync Telemetry Overlay with telemetry data
10-
- Ensure real-time updates
11-
- Maintain overlay stability and performance
9+
- Validate all integrations (input, mission, telemetry)
10+
- Confirm stability and performance
11+
- Ensure no regressions across samples
1212

1313
---
1414

1515
## BUILD
1616

1717
### Scope
18-
- Connect overlay system to telemetry data sources
19-
- Ensure Telemetry Overlay updates in real time
20-
- No changes to overlay cycle behavior or positioning
18+
- Full system validation across all samples
19+
- Verify:
20+
- Bottom-right placement
21+
- Non-Tab cycle behavior
22+
- Config-driven stacks
23+
- Mission + telemetry integration
24+
- No feature or runtime changes unless blocking issue found
2125

2226
### Test Steps
23-
1. Generate telemetry data
24-
2. Verify Telemetry Overlay updates
25-
3. Cycle overlays and confirm consistency
26-
4. Confirm no regression in other overlays
27+
1. Load all Level 17/18 samples
28+
2. Cycle overlays under load
29+
3. Trigger mission + telemetry updates
30+
4. Resize + rapid switching tests
31+
5. Confirm persistence and diagnostics behavior
2732

2833
### Expected
29-
- Telemetry Overlay reflects live data
30-
- Overlay system remains stable
34+
- Fully stable overlay system
35+
- All integrations working
36+
- Ready for production baseline

0 commit comments

Comments
 (0)