Skip to content

Commit bfc2e48

Browse files
author
DavidQ
committed
Update roadmap status for completed Preview Generator V2 work - PR_26126_050-preview-generator-v2-roadmap-status
1 parent 1fdca7b commit bfc2e48

1 file changed

Lines changed: 37 additions & 0 deletions

File tree

Lines changed: 37 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,37 @@
1+
PR_26126_050 Preview Generator V2 roadmap status
2+
3+
Scope
4+
- Reviewed docs/dev/roadmaps/MASTER_ROADMAP_ENGINE.md for existing Preview Generator V2 roadmap entries.
5+
- No code, samples, schemas, or start_of_day files were modified.
6+
- No roadmap text was added or rewritten.
7+
8+
Roadmap findings
9+
- No existing `Preview Generator V2` roadmap item was found in docs/dev/roadmaps/MASTER_ROADMAP_ENGINE.md.
10+
- No existing `preview-generator-v2` roadmap item was found in docs/dev/roadmaps/MASTER_ROADMAP_ENGINE.md.
11+
- The existing preview-related roadmap items are already complete and refer to Asteroids preview/direct launch behavior, not Preview Generator V2:
12+
- `[x] Asteroids preview direct launch separation from Workspace Manager remains valid.`
13+
- `[x] Direct game launch hook removal prevents normal preview redirects to Workspace Manager.`
14+
- The remaining incomplete roadmap markers in MASTER_ROADMAP_ENGINE.md are unrelated Level 8 cleanup/tool-alignment items:
15+
- `[ ] Verify palette/shared data never embeds inside tool payload files.`
16+
- `[.] Verify workspace schema has no sample-only concepts.`
17+
- `[.] Unused JSON cleanup audit (tools + explicit deletion candidates) is in progress.`
18+
- `[.] Palette opaque alpha normalization (#RRGGBBFF -> #RRGGBB) is in progress.`
19+
- `[.] Tool-owned JSON asset input wiring for extracted code-defined assets is in progress.`
20+
- `[.] Hardcoded color/shape removal plan is in progress.`
21+
22+
Status update decision
23+
- No MASTER_ROADMAP_ENGINE.md status marker was changed.
24+
- Reason: this PR allows only existing status marker transitions and explicitly forbids adding roadmap items or modifying roadmap text.
25+
- Adding a new Preview Generator V2 item would violate the PR requirements.
26+
- Changing unrelated incomplete Level 8 items would misrepresent their actual status.
27+
28+
Validation
29+
- `rg -n -i -C 3 "preview|generator|tool" docs/dev/roadmaps/MASTER_ROADMAP_ENGINE.md` was used to inspect relevant roadmap references.
30+
- `rg -n "\\[ \\]|\\[\\.\\]" docs/dev/roadmaps/MASTER_ROADMAP_ENGINE.md` was used to inspect incomplete roadmap markers.
31+
- `git diff -- docs/dev/roadmaps/MASTER_ROADMAP_ENGINE.md` has no output.
32+
- No samples, schemas, or start_of_day files were modified.
33+
34+
Manual validation
35+
- Open docs/dev/roadmaps/MASTER_ROADMAP_ENGINE.md.
36+
- Confirm there is no existing Preview Generator V2 item to mark complete.
37+
- Confirm unrelated incomplete Level 8 items remain unchanged.

0 commit comments

Comments
 (0)